Integrating Pool Perimeter Overflow Edge Techniques

6 MIN READ

Site conditions

The soils report indicated that no specialized foundation would be required, with the exception of a keyway under the vanishing edge. The toughest task was to ensure that the finished elevation of the coping aligned with the existing polished limestone decks and patios.

About the Author

No recommended contents to display.